In 4Q2016, IG signed a contract with Illinois-based solar developer WCP-Solar to manage an industrial size battery of 1 MW to be installed at the site of Solberg Mfg in Itasca, IL. The battery is integrated by IHI Storage and will be paired with a 600 kW solar system. The system will be complete in 2Q2017 and will start […]